![]() ![]() The project is expected to be commissioned in March 2025. ![]() The project has been won ₹2.90 per unit on Build Own and Operate basis through e-reverse auction. The development cost of 100 MW Wind Power Project is around ₹750 crores. ![]() The project is expected to generate 456 MU in the 1st year and the cumulative energy generation over a period of 25 years would be about 10,481 MUs. The project is expected to be commissioned in December 2024. SGEL has bagged the project at a tariff of ₹2.90 per unit through competitive bidding process in an e-reverse auction organized by MSEDCL. The development cost of 200 MW Ground Mounted Solar Project in Maharashtra is around ₹1,200 Crores. PPA has been signed for 200 MW Solar Power Project Capacity with Maharashtra State Electricity Distribution Company Limited (MSEDCL) at Mumbai and with Solar Energy Corporation of India Limited (SECI) for 100 MW Wind Power Capacity at Delhi. The PPAs have been signed by SJVN Green Energy Limited (SGEL), a wholly owned subsidiary of the Company. SJVN Ltd has signed Power Purchase Agreements (PPA) for 300 MW Renewable Energy Projects. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |